
Serving Mammoth Lakes since 1981, Mammoth Resort Management handles full-service HOA and condo association management — from financial oversight to maintenance coordination across dozens of mountain condo complexes.
mammothresortmanagement.com50+ buildings
Managed Properties
$2.5M+ in roof reserves
Roof Reserve Exposure
$1.5M-$1.75M
Potential Savings
85%
Cost Reduction
With decades of managing mountain condo associations, MRM understands the challenge of roof reserve funding. GoNano treatment can extend roof life 10-15 years, potentially deferring $500K+ in special assessments across their managed portfolio.
For a portfolio of 50+ buildings, the math is compelling. A typical Mammoth condo complex with 4 buildings averaging 3,000 sq ft of roof each faces $144,000-$180,000 in replacement costs. GoNano treatment for the same complex runs approximately $21,000-$25,200 — an 83-85% cost reduction. Across MRM's entire portfolio, this could represent millions in deferred capital expenditures. More importantly, it means reserve studies can allocate those funds to other critical infrastructure — elevators, plumbing, parking structures — that also face accelerated mountain wear.
California Civil Code §5550 Compliance
HOA boards are required to conduct reserve studies every 3 years. GoNano treatment documentation provides evidence of proactive maintenance that can justify extended useful life projections — reducing required reserve allocations and monthly assessments.
With 50+ buildings under management, MRM's aggregate roof reserve allocation likely exceeds $2M. GoNano treatment could reduce that requirement by 60-70%, freeing substantial capital for other deferred maintenance items required under California Civil Code §5550.
Full Replacement
$1,800,000
150,000 sq ft × $12/sq ft
GoNano Treatment
$262,500
150,000 sq ft × $1.75/sq ft
Total Savings
$1,537,500
85% cost reduction
Freeze-Thaw Protection
Maintains shingle flexibility through extreme temperature cycles (-10°F to +90°F)
UV at Altitude
Silica reflects intense UV radiation at 8,000+ feet — the #1 cause of mountain roof degradation
Quick Application
2-4 hours per building — no scaffolding, no multi-week disruption to tenants or guests
Insurance Advantage
UL-tested hail impact improvement helps maintain insurance coverage as carriers exit California
We'll prepare a customized reserve study impact analysis for your specific buildings — including building-by-building breakdowns and a board-ready presentation.